Research Article
Energy-Saving Production Scheduling in a Single-Machine Manufacturing System by Improved Particle Swarm Optimization
Algorithm 3
Insertion operator for gbest.
ā | Require: gbest, problemData | ā | Ensure: | (1) | time window | (2) | time window | (3) | | (4) | | (5) | | (6) | | (7) | initialize | (8) | for each do | (9) | āā | (10) | end for | (11) | for each do | (12) | āā | (13) | end for | (14) | | (15) | return |
|