Research Article

A Model for the Spacing of Quicklime Pile to Treat High Water Content Loess

Figure 1

Schematic of quicklime piles installed in a triangular arrangement (a) and a square arrangement (b) and the affected soil range ( is the initial pile diameter, is the pile diameter after expansion, and is the pile spacing).
(a)
(b)