Mathematical Problems in Engineering / 2020 / Article / Tab 6

Research Article

Energy Saving in Flow-Shop Scheduling Management: An Improved Multiobjective Model Based on Grey Wolf Optimization Algorithm

Table 6

Sequence-dependent start-up time.

JobJob i = 1Job i = 2Job i = 3
j = 1j = 2j = 3j = 1j = 2j = 3j = 1j = 2j = 3

i′ = 1584468644
i′ = 2646232462
i′ = 3248242644

Article of the Year Award: Outstanding research contributions of 2020, as selected by our Chief Editors. Read the winning articles.