No. CRFs Probability Severity Urgency Uncontrollability Infectiousness Normalized impact 1 Technical conditions for wind turbine 5 5 6 3 5 1.0000 2 Policy subsidy risk 4 4 6 4 5 0.9519 3 Grid connection risk 5 5 5 3 5 0.9448 4 Regional absorptive capacity 5 5 6 2 5 0.8800 5 Operation &maintenance risk 6 4 5 3 4 0.8684 6 Demand risk of electricity consumption 4 5 6 2 5 0.8179 7 Topographic conditions 4 6 4 3 4 0.8069 8 Project construction risk 6 4 5 3 3 0.7896 9 On-grid price risk 5 4 5 2 5 0.7693 10 Operation &maintenance cost 5 5 4 3 3 0.7420 11 Wind resource condition risk 4 5 4 2 5 0.7121 12 Ecological damage risk 4 5 5 2 4 0.7121 13 Impact on agriculture and tourism 4 5 5 2 4 0.7121 14 Green power certificate risk 3 4 5 3 4 0.6860 15 Climatic conditions 5 4 3 4 3 0.6860 16 Public acceptance 3 5 5 2 4 0.6420 17 Construction cost risk 3 4 4 3 4 0.6324 18 Profitability risk 3 4 4 3 4 0.6324