Research Article

Optimal Placement of Wind Power Plants in Transmission Power Networks by Applying an Effectively Proposed Metaheuristic Algorithm

Table 4

The results obtained by five implemented methods for Case 1.2.

MethodFBIHBOMSGOCEAMEA

Minimum cost ($/h)763.96762.72765.22762.89762.52
Mean cost ($/h)767.96764.32782.08764.59763.54
Maximum cost ($/h)786.95766.45869.63767.68766.17
STD4.450.9618.271.290.94
N11030153030
N3100100100100100