Table 6
The results obtained by five implemented methods for Subcase 1.3.1.
| Method | FBI | HBO | MSGO | CEA | MEA |
| Minimum cost ($/h) | 728.61 | 728.40 | 728.80 | 728.39 | 728.15 | Mean cost ($/h) | 731.27 | 729.73 | 736.72 | 731.28 | 728.74 | Maximum cost ($/h) | 738.69 | 731.50 | 762.72 | 765.83 | 730.55 | STD | 1.89 | 0.71 | 7.52 | 5.13 | 0.57 | N1 | 20 | 60 | 30 | 60 | 60 | N3 | 100 | 100 | 100 | 100 | 100 | Generation of WPP at node 30 (MW) | 9.9731 | 10 | 9.9589 | 10 | 10 | Generation of WPP at node 3 (MW) | 9.9693 | 10 | 9.9999 | 9.9858 | 10 | Power factor of WPP at node 30 | 0.92 | 0.9004 | 0.9803 | 0.9048 | 0.8857 | Power factor of WPP at node 3 | 0.9782 | 0.9366 | 0.9992 | 0.9838 | 0.947 |
|
|