Research Article

Optimal Placement of Wind Power Plants in Transmission Power Networks by Applying an Effectively Proposed Metaheuristic Algorithm

Table 7

The results obtained by five implemented methods for Subcase 1.3.2.

MethodFBIHBOMSGOCEAMEA

Minimum cost ($/h)728.20727.41728.81726.84726.77
Mean cost ($/h)730.67728.69731.75728.17728.04
Maximum cost ($/h)733.77729.89739.08730.59730.35
STD1.270.602.200.980.95
N12060306060
N3100100100100100
Locations of WPPs30, 2430, 1924, 1930, 530, 5
Generation of WPPs (MW)9.95, 9.962310, 9.999510, 9.998210, 1010, 10
Power factor of WPPs0.9604, 0.93490.9605, 0.93940.9418, 0.91350.9342, 0.94580.9433, 0.8718