Research Article
Optimal Placement of Wind Power Plants in Transmission Power Networks by Applying an Effectively Proposed Metaheuristic Algorithm
Table 7
The results obtained by five implemented methods for Subcase 1.3.2.
| Method | FBI | HBO | MSGO | CEA | MEA |
| Minimum cost ($/h) | 728.20 | 727.41 | 728.81 | 726.84 | 726.77 | Mean cost ($/h) | 730.67 | 728.69 | 731.75 | 728.17 | 728.04 | Maximum cost ($/h) | 733.77 | 729.89 | 739.08 | 730.59 | 730.35 | STD | 1.27 | 0.60 | 2.20 | 0.98 | 0.95 | N1 | 20 | 60 | 30 | 60 | 60 | N3 | 100 | 100 | 100 | 100 | 100 | Locations of WPPs | 30, 24 | 30, 19 | 24, 19 | 30, 5 | 30, 5 | Generation of WPPs (MW) | 9.95, 9.9623 | 10, 9.9995 | 10, 9.9982 | 10, 10 | 10, 10 | Power factor of WPPs | 0.9604, 0.9349 | 0.9605, 0.9394 | 0.9418, 0.9135 | 0.9342, 0.9458 | 0.9433, 0.8718 |
|
|