An Empirical Study of Software Metrics Diversity for Cross-Project Defect Prediction
Table 5
Comparison of the CPDP performance in terms of F-measure.
Metrics
Target
Eclipse
Equinox
Lucene
Mylyn
Pde
Semantic
0.330 (+62.62%)
0.385 (+55.93%)
0.450 (+0.22%)
0.442 (+12.06%)
0.454 (+4.01%)
PS
0.415 (+29.22%)
0.528 (+13.63%)
0.382 (+18.06%)
0.379 (+30.61%)
0.380 (+24.21%)
OS
0.448 (+19.73%)
0.566 (+6.17%)
0.408 (+10.54%)
0.370 (+33.78%)
0.413 (+14.29%)
SS
0.511 (+4.93%)
0.584 (+2.83%)
0.451 (—)
0.479 (+3.34%)
0.453 (+4.19%)
OSS
0.536
0.601
0.451
0.495
0.472
POSS
0.489 (+9.58%)
0.583 (+3.07%)
0.424 (+6.37%)
0.472 (+4.87%)
0.436 (+8.26%)
Note: The percentages within the parentheses are the improvement rates of CPDP-OSS, and the boldfaced numbers represent the best results in the same context.