Multiarea Economic Dispatch Using Evolutionary Algorithms
Table 1
Parameters are taken into account to deal with Test System 3.
| Parameter | Value |
| Total power demand (MW) | 10500 | Tie line limit (MW) | 200/100 | Area load demand (%) | 15/40/30/15 | Population size | 80 | | 0.9 | | 0.1 | c1b | 2 | c1p | 0.5 | | 5 | | 3.9 | | 2/3 | k | 4 | itrmin/itrmax | 1/1000 |
|
|