Research Article

Multiarea Economic Dispatch Using Evolutionary Algorithms

Table 3

Power dispatch of 4 units according to power demand.

Power (MW)PD = 1000 (MW) (DPSO)PD = 1000 (MW) (GWO)PD = 1120 (MW) (DPSO)PD = 1120 (MW) (GWO)

P1381.73381.59444.95422.5
P2195.58194.66215.93211.42
P3118.3118.46139.05167.63
P4304.39305.33320.07318.45
Tie line power flow (MW)199.97199.96200193.87