Research Article
Multiarea Economic Dispatch Using Evolutionary Algorithms
Table 3
Power dispatch of 4 units according to power demand.
| Power (MW) | PD = 1000 (MW) (DPSO) | PD = 1000 (MW) (GWO) | PD = 1120 (MW) (DPSO) | PD = 1120 (MW) (GWO) |
| P1 | 381.73 | 381.59 | 444.95 | 422.5 | P2 | 195.58 | 194.66 | 215.93 | 211.42 | P3 | 118.3 | 118.46 | 139.05 | 167.63 | P4 | 304.39 | 305.33 | 320.07 | 318.45 | Tie line power flow (MW) | 199.97 | 199.96 | 200 | 193.87 |
|
|