Research Article
Task Scheduling for Multiunit Parallel Test Using Mixed-Integer Linear Programming
Table 7
Model statistics and solution details of example 7ā using 3 threads.
| Model | Binary variables | Continuous variables | Constraints | Best solution (s) | Additional computation time (s) | SR | ARUR (%) |
| (32) | 1088 | 32 | 6395 | 815 | 5.2 | 1.93 | 38.0 | (33) | 1155 | 33 | 6415 | 833.4 | 6.4 | 1.97 | 38.1 | (34) | 1224 | 34 | 7247 | 853.4 | 9.1 | 2.07 | 47.1 |
|
|