Research Article

Inspection Allocation Optimization with Resource Constraints Based on Modified NSGA-II in Flexible Manufacturing Systems

Table 2

Parameters of the simulation experiment.

ParameterRange

0.1–0.6
0.001–0.06
2–3
MC20–80
IC10–20
SC800–2000
RC20–80
CSC200–500