Research Article

Inspection Allocation Optimization with Resource Constraints Based on Modified NSGA-II in Flexible Manufacturing Systems

Table 4

The result of I4_A by using three methods.

MethodsNSelected SchemeCostsobj1obj2HV
P1/P2/P3/P4MC/IC/DC/RC/CNC

Modified NSGA-II8LI00011/00101/00100/01000569/31/418/41/7431800.7650.89
IA00031/00103/00200/01000
NSGA-II2LI00011/00101/10100/01000561/52/418/41/733/1805.8740.85
IA00011/00103/10200/02000
All inspectionLI11111/11111/11111/11111380/351/992/30/3582111.54536
IA31333/22231/13333/22212

Note. LI = location of inspection station; RA = inspection station assignment scheme. N = the number of solutions in nondominated solutions set; “—” means not available.