Inspection Allocation Optimization with Resource Constraints Based on Modified NSGA-II in Flexible Manufacturing Systems
Table 4
The result of I4_A by using three methods.
Methods
N
Selected Scheme
Costs
obj1
obj2
HV
P1/P2/P3/P4
MC/IC/DC/RC/CNC
Modified NSGA-II
8
LI
00011/00101/00100/01000
569/31/418/41/743
1800.7
65
0.89
IA
00031/00103/00200/01000
NSGA-II
2
LI
00011/00101/10100/01000
561/52/418/41/733/
1805.8
74
0.85
IA
00011/00103/10200/02000
All inspection
—
LI
11111/11111/11111/11111
380/351/992/30/358
2111.5
4536
—
IA
31333/22231/13333/22212
Note. LI = location of inspection station; RA = inspection station assignment scheme. N = the number of solutions in nondominated solutions set; “—” means not available.