Project Portfolio Selection and Scheduling with Resource Allocation, Synergies, and Project Divisibility
Table 5
Gap reduction vs. time reduction.
| Required gap (%) | Reduction of solution time (%) | Actual gap (%) | Median | Mean | Median | Mean |
| 10 | 74.0 | 72.7 | 2.66 | 2.91 | 20 | 81.0 | 78.0 | 5.78 | 5.96 |
|
|