Research Article
Application of Service Modular Design Based on a Fuzzy Design Structure Matrix: A Case Study from the Mining Industry
Table 10
Experts’ evaluations of the time correlation between service activities 8 and 9.
| Expert | Fuzzy semantics | Triangular fuzzy number |
| 1 | Coal mining should not precede drivage. | (0, 0.1, 0.3) | 2 | Coal mining cannot precede drivage, but both of them circulate many times. | (0.8, 0.9, 1) | 3 | Coal mining should not precede drivage. | (0, 0.1, 0.3) | 4 | Coal mining cannot precede drivage, but both of them circulate many times. | (0.8, 0.9, 1) | 5 | Coal mining cannot precede drivage, but both of them circulate many times. | (0.8, 0.9, 1) |
|
|