Research Article

Optimization of Multiobjective Configuration of Multienergy Microgrid Based on HMM and Typical Scenarios: A Case Study of Smart Park

Table 3

The investment, operation, and maintenance parameters of the components.

EquipmentParameter

CHP = 95000 yuan;  = 3000 yuan/kW;  = 0.16 yuan/kWh
Heat pump = 4000 yuan/kW;  = 0.15 yuan/kWh
Absorption refrigerator = 4000 yuan/kW;  = 0.15 yuan/kWh
Gas-fired boiler = 1500 yuan/kW;  = 0.1 yuan/kWh
Distributed PV = 5000 yuan/kW;  = 150 yuan/kW/year
Distributed wind power = 6000 yuan/kW;  = 0.06 yuan/kWh
Photothermal = 250 yuan/m2;  = 220 yuan/m2/year
Heat storage equipment = 450 yuan/kWh;  = 0.09 yuan/kWh
Electrical energy storage = 2500 yuan/kWh;  = 0.04 yuan/kWh
Thermal pipeline = 750 yuan/m