Research Article

Grid Impact Assessment of Centralized and Decentralized Photovoltaic-Based Distribution Generation: A Case Study of Power Distribution Network with High Renewable Energy Penetration

Table 2

Point of common coupling loading.

ā€‰P (MW)Q (MVar)S (MVA)% PF% loading

Current situation8.572.909.0594.7239.34
Centralized4.192.915.1082.1322.15
Decentralized7.732.818.2393.9835.77