Research Article

Empowered Hybrid Parent Selection for Improving Network Lifetime, PDR, and Latency in Smart Grid

Figure 6

Occurrence of early depletion node: (a) 3-ary tree structure of RPL network with node 2 disabled; (b) local route maintenance session performed by node 5.
(a)
(b)