|
Parameter |
|
| The output of the j-th wind turbine at time t, kW | | Wind speed at time t, m/s |
| Cut-in wind speed of the j-th wind turbine, m/s | | Cut-out wind speed of the j-th wind turbine, m/s |
| Rated wind speed of the j-th wind turbine, m/s | | Photoelectric conversion efficiency, % |
| The area of photovoltaic panels, m2 | | Light intensity, |
| Conversion efficiency of thermal power generating units, % | | Transferable load Boolean variable |
| Original load, kW | | Average travel distance of category k electric vehicles |
| Standard deviation distance of category k electric vehicles | | The minimum state of charge of electric vehicles |
| Unit investment and construction cost of wind turbine, $ | | Unit investment and construction cost of photovoltaic panels, $ |
| Unit investment and construction cost of thermal power generating unit, $ | | Investment and construction cost of unit fast charge charging pile, $ |
| Investment and construction cost of unit slow charge charging pile, $ | | Investment and construction cost of unit energy storage system, $ |
| Operation and maintenance rate of wind turbine, % | | Operation and maintenance rate of photovoltaic panels, % |
| Operation and maintenance rate of fast-charging pile, % | | Operation and maintenance rate of slow-charging pile, % |
| Operation and maintenance rate of thermal power generating units, % | | Operation and maintenance rate of wind turbine, $ |
| Operation and maintenance rate of photovoltaic panels, $ | | Operation and maintenance rate of fast-charging pile, $ |
| Operation and maintenance rate of slow-charging pile, $ | | Operation and maintenance rate of thermal power generating units, $ |
| Unit interruptible load compensation cost, $/kW | | Unit transferable load compensation cost, $/kW |
|
Variable |
| Number of wind turbines in scenario | | Number of thermal power generating in scenario |
| Number of photovoltaic panels in scenario | | Number of energy storage systems in scenario |
| Number of fast-charging piles in scenario | | Number of slow-charging piles in scenario |
| The output of the j-th wind turbine at time t, kW | | The output of photovoltaic panels at time t, kW |
| Fast-charging load of the j-th electric vehicle at time t, kW | | Slow-charging load of the j-th electric vehicle at time t, kW |
| The output of the j-th thermal power generating unit at time t, kW | | Energy storage system discharge power at time t in scenario ; kW |
| Purchase electricity from the grid at time t, kW | | Energy storage system charge power at time t in scenario , kW |
| Sell electricity from the grid at time t, kW | | |
|
Acronyms |
CVaR | Conditional value-at-risk | VaR | Value-at-risk |
VPP | Virtual power plant | EV | Electric vehicle |
|