Intelligent Recognition of Safety Risk in Metro Engineering Construction Based on BP Neural Network

Table 1

Risk levels of subway construction.

Risk levelInterval rangeMeaning

Level 1(0, 0.2]Acceptable and strive to control the risk within this level
Level 2(0.2, 0.4]Acceptable, it is allowed to occur within certain conditions without escalating the risk level
Level 1(0.4, 0.6]Do not want to happen; compare the adverse effects of risks and the cost of measures taken
Level 4(0.6, 0.8]Unacceptable; immediately formulate risk response measures
Level 5(0.8, 1]Completely unacceptable; eliminate or avoid risks