Intelligent Recognition of Safety Risk in Metro Engineering Construction Based on BP Neural Network
Table 1
Risk levels of subway construction.
| Risk level | Interval range | Meaning |
| Level 1 | (0, 0.2] | Acceptable and strive to control the risk within this level | Level 2 | (0.2, 0.4] | Acceptable, it is allowed to occur within certain conditions without escalating the risk level | Level 1 | (0.4, 0.6] | Do not want to happen; compare the adverse effects of risks and the cost of measures taken | Level 4 | (0.6, 0.8] | Unacceptable; immediately formulate risk response measures | Level 5 | (0.8, 1] | Completely unacceptable; eliminate or avoid risks |
|
|