Research Article
Intelligent Recognition of Safety Risk in Metro Engineering Construction Based on BP Neural Network
Table 2
Risk intelligent identification results.
| Security risk classification | Rule coding | Risk description | Credibility |
| Construction technology risk factors | R1-2 | Quicksand | 0.7 | R1-27 | Unstable steel structure of foundation pit | 0.49 | R1-16 | Unstable foundation pit retaining structure | 0.19 | Project characteristics risk factors | — | — | — | Geological and hydrological risk factors | R3-02 | Harmful geological conditions | 0.33 | Risk factors of construction environment | R4-14 | Leaks and cracks in underground pipelines | 0.28 |
|
|