Research Article

A Novel Hybrid MCDM Model for the Evaluation of Sustainable Last Mile Solutions

Table 4

Criteria evaluation by the stakeholders’ representatives (Res., Use., Pro., and Adm.).

C1C2C3C4C5C6C7C8C9C10

C1(/,/,/,/)(FL,VL,/,L)(/,/,L,VL)(/,/,L,VL)(/,L,FL,/)(VL,L,VL,/)(FL,H,FH,/)(/,FH,EH,/)(/,M,EH,/)(/,N,H,/)
C2(/,/,N,/)(/,/,/,/)(/,/,L,/)(/,/,L,/)(/,VL,FL,/)(/,VL,VL,/)(/,FH,FH,/)(/,M,EH,/)(/,FL,EH,/)(/,/,H,/)
C3(N,L,/,/)(FL,FL,/,VL)(/,/,/,/)(/,/,N,/)(/,M,VL,/)(VL,M,/,/)(FL,EH,FL,/)(/,VH,H,/)(/,H,H,/)(/,L,M,/)
C4(FL,L,/,/)(H,FL,/,VL)(FL,N,/,N)(/,/,/,/)(L,M,VL,/)(M,M,/,/)(H,EH,FL,/)(/,VH,H,/)(/,H,H,/)(/,L,M,/)
C5(VL,/,/,M)(M,/,/,H)(VL,/,/,FH)(/,/,/,FH)(/,/,/,/)(L,N,/,/)(M,M,L,L)(/,FL,FH,VL)(/,L,FH,L)(/,/,FL,N)
C6(/,/,/,H)(L,/,/,EH)(/,/,VL,VH)(/,/,VL,VH)(/,/,L,L)(/,/,/,/)(L,M,M,M)(/,FL,VH,FL)(/,L,VH,M)(/,/,FH,L)
C7(/,/,/,L)(N,/,/,M)(/,/,/,FL)(/,/,/,FL)(/,/,/,/)(/,/,/,/)(/,/,/,/)(/,/,FL,/)(/,/,FL,/)(/,/,VL,/)
C8(M,/,/,FL)(VH,/,/,FH)(M,/,/,M)(VL,/,/,M)(FL,/,/,/)(FH,/,/,/)(VH,VL,/,VL)(/,/,/,/)(/,/,/,VL)(/,/,/,/)
C9(FH,/,/,L)(EH,/,/,M)(FH,/,/,FL)(L,/,/,FL)(M,/,/,/)(H,/,/,/)(EH,L,/,N)(VL,VL,N,/)(/,/,/,/)(/,/,/,/)
C10(FH,/,/,M)(EH,VL,/,H)(FH,/,/,FH)(L,/,/,FH)(M,L,/,/)(H,L,/,/)(EH,H,/,L)(VL,FH,L,VL)(N,M,L,L)(/,/,/,/)