Combined Configuration of Container Terminal Berth and Quay Crane considering Carbon Cost
| Parameter | Parameter meaning | Parameter values |
| | Operating cost per unit time of quay crane | 93.03 | | Cost of per unit time carbon emission of quay cranes | 1.52 | | Per unit distance transportation cost of truck | 2.2 | | Carbon emission cost of per unit truck transportation | 0.015 | P | Per unit carbon emission cost | 16.5 | | The charging standard for anchorage | 0.05 | | The productive berthing charge standard | 0.23 | | The charge standard for unproductive berthing of the terminal | 0.15 | | Loading and unloading capacity per unit time of quay crane | 35Per hour | | Berth spacing | 0.3 km | | Depth of berth J | 15.5 m | | Length of berth J | 0.3 km |
|
|