Research Article
Combined Configuration of Container Terminal Berth and Quay Crane considering Carbon Cost
Table 7
Model optimization comparison table.
| Plan | F (yuan) | (yuan) | (yuan) | T (hour) |
| Joint plan | 220972.7 | 234093.4 | 190357.7 | 40.3 | Traditional plan | 234871.9 | 241092.1 | 220358.1 | 45.7 | Change rate | 6.29%↑ | 2.99%↑ | 15.76%↑ | 13.4%↑ |
|
|