Research Article

Combined Configuration of Container Terminal Berth and Quay Crane considering Carbon Cost

Table 9

Sensitivity analysis table based on carbon cost change.

Carbon emission costs (yuan/tun)Target function value (yuan)Terminal operation cost (yuan)Port time cost of the ship (yuan)Average port time (hour)

16.5220972.7234093.4190357.740.3
50224949.6238092.3194283.340.7
80228747.7243083.9195296.641.5
110233672.9249267.2197286.242.7
140241136.1257632.8202643.843.8
170244037.1259726.5207427.845.7
200245684.8262080.4207428.448.8