Research Article
Maintenance Optimization Based on Three-Stage Failure Process under Performance-Based Contracting
Table 2
Notations used in this paper.
| Notations | Descriptions |
| Xn | Random variable representing the duration of the nth stage of the system, n = 1, 2, 3 | fXn | Probability density function of Xn, n = 1, 2, 3 | FXn | Cumulative distribution function of Xn, n = 1, 2, 3 | t | Inspection interval | Tp | Time to preventive replacement | Tf | Time to failure | Cins | Cost per inspection | Cp | Cost per preventive renewal | Cf | Cost per failure renewal | Dp | Downtime per preventive renewal | Df | Downtime per failure renewal | EC | Expected cost in a renewal cycle | Tdown | Expected downtime in a renewal cycle | Tup | Expected uptime in a renewal cycle | EC(t) | Expected cost rate per unit time | A(t) | Expected average availability | ER(t) | Expected revenue rate per unit time | EP(t) | Expected profit rate per unit time | Rmax | The upper limit of revenue |
|
|