Research Article

Maintenance Optimization Based on Three-Stage Failure Process under Performance-Based Contracting

Table 2

Notations used in this paper.

NotationsDescriptions

XnRandom variable representing the duration of the nth stage of the system, n = 1, 2, 3
fXnProbability density function of Xn, n = 1, 2, 3
FXnCumulative distribution function of Xn, n = 1, 2, 3
tInspection interval
TpTime to preventive replacement
TfTime to failure
CinsCost per inspection
CpCost per preventive renewal
CfCost per failure renewal
DpDowntime per preventive renewal
DfDowntime per failure renewal
ECExpected cost in a renewal cycle
TdownExpected downtime in a renewal cycle
TupExpected uptime in a renewal cycle
EC(t)Expected cost rate per unit time
A(t)Expected average availability
ER(t)Expected revenue rate per unit time
EP(t)Expected profit rate per unit time
RmaxThe upper limit of revenue