Research Article

Performance of a Three-Substep Time Integration Method on Structural Nonlinear Seismic Analysis

Table 3

Time cost of various methods in time history of 0–30 s for example 4.3.1.

MethodG-α ()G-α ()Bathe ()Bathe ()OTTBIF ()Wen ()Wen ()

Time Step (s)
Elapsed time (s)0.4300.1520.2210.1600.1840.1800.180