Research Article

A Note on Multimachine Scheduling with Weighted Early/Late Work Criteria and Common Due Date

Algorithm 1

.
(1)Reorder the jobs by nondecreasing order of their weights, i.e., ;
(2)Assign to ;
(3)for ()
(4 )do Calculate to find a suitable machine for with the
ā€‰(current) maximal criterion value, say ;
(5)Schedule on the first position of , and move the already
ā€‰scheduled jobs on (if any) backward;