Research Article
Performance Analysis of Tyre Manufacturing System in the SMEs Using RAMD Approach
Table 3
Effect of changes in the availability of tyre production system.
| Subsystem | Availability at faulty state | Availability at ideal state |
| Banbury mixing | 0.8827 | 0.9206 | Bead and belt cord making | 0.8859 | 0.9153 | Calendaring | 0.9344 | 0.9528 | Bias cutting | 0.8387 | 0.8523 | Extruding | 0.8555 | 0.8982 | Building | 0.9339 | 0.9485 | Curing | 0.9535 | 0.9594 |
|
|