[Retracted] Real-Time Scheduling of Mixed Model Assembly Line with Large Variety and Low Volume Based on Event-Triggered Simulated Annealing (ETSA)
Table 3
Scheduling results and makespan.
Job
Machine
Makespan
M1
M2
M3
M4
M5
T
1
{1, 4, 2}
{10, 19, 3}
{19, 24, 1}
{24, 34, 4}
{35, 38, 5}
36
2
{0, 8, 4}
{8, 14, 1}
{14, 19, 2}
{19, 20, 5}
{22, 25, 3}
38
3
{0, 1, 3}
{1, 6, 4}
{8, 13, 1}
{13, 22, 2}
{24, 29, 5}
30
4
{6, 10, 2}
{14, 21, 1}
{29, 32, 3}
{34, 38, 4}
{38, 39, 5}
49
5
{13, 23, 4}
{23, 30, 2}
{30, 35, 1}
{35, 41, 5}
{41, 49, 3}
45