Research Article

Dynamic Evaluation Method of the EW-AHP Attribute Identification Model for the Tunnel Gushing Water Disaster under Interval Conditions and Applications

Table 12

Comparison of risk assessment results before and after excavation.

Tunnel section X4Attribute measure valuesRisk level
R1R2R3R4

X430.23420.10800.15560.5022R4
X430.23420.10800.13850.5192R4