Research Article

[Retracted] “Intelligent” Technical Guidelines for Chongqing East Railway Station Building and Supporting Hub Area

Table 2

Passenger flow detection, early warning, and control measures.

No.Early warningPassenger flow control measuresTiming of control measures starting (person)Control purpose

1First-level warningFirst-level passenger flow controlSlow down the speed of passengers arriving at the platform; reduce the number of passengers on the platform

2Second-level warningSecond-level passenger flow controlSlow down the speed of passengers reaching the pay zone; reduce the number of passengers in the pay zone

3Third-level warningThird-level passenger flow controlSlow down the speed of passengers entering the station and reduce the number of passengers at the station