Research Article

[Retracted] “Intelligent” Technical Guidelines for Chongqing East Railway Station Building and Supporting Hub Area

Table 3

Passenger flow control information list.

Travel informationHighway passenger transportation: station and agent, transport vehicle, circuit, route, train number, earliest (late) route information, etc.
Bus route: bus stop, bus recharge station, transit interchange station, bus number, each bus route, transport vehicle, earliest (late) route information, etc.
Airport: round-trip flight information, such as route, take-off and landing airport, flight direction, take-off (landing) time, delay information, etc.
Railway station: round-trip information, such as circuit, route, station and time, start/arrive time, delay information, etc.
Port: round-trip shipping information such as circuit, directions, routes, docks and times, voyage departure and destination times, carrier company and ship information, water passenger flight information, etc.

The freight informationHighway, railway station, airport, port, yard and station, logistics center and other shift information, cargo information, cargo tracking, vehicle information, driver information, logistics enterprise information, etc.

Road informationData such as traffic flow, traffic accident, accident rescue, traffic control, highway closure, road maintenance, warning of road sections prone to landslides, road infrastructure, information equipment, etc.