Research Article

An Improved Monte Carlo Method Based on Neural Network and Fuzziness Analysis: A Case Study of the Nanpo Dump of the Chengmenshan Copper Mine

Table 7

Bootstrap method calculation results.

Probability of failure Reliability index
Mean90% confidence interval of meanStandard deviationMean90% confidence interval of meanStandard deviation

40.75%0.1080.2430.291