Correlation degree of each index to each risk level.

IndexIIIIIIIVVRisk level

A12−0.4750−0.30000.0500−0.0455−0.3438III
A22−0.6875−0.5833−0.37500.2500−0.1667IV
B11−0.6688−0.5583−0.33750.3250−0.1970IV
D15−0.5563−0.4083−0.11250.1452−0.3039IV
D16−0.31820.0714−0.0625−0.3750−0.5313II
D23−0.8188−0.7583−0.6375−0.27500.6111V
D24−0.4313−0.24170.1375−0.1078−0.3592III
D26−0.7000−0.6000−0.40000.2000−0.1429IV
E11−0.5688−0.4250−0.13750.1897−0.2959IV
E24−0.3611−0.11540.1500−0.2333−0.4250III