Major quantities of the best phase plan.

ā€‰Phase 1Phase 2Phase 3Phase 4Total

Coal quantity/Mt200.15200.50200.66220.29821.60
Rock quantity/Mm3640.18847.811012.221391.333891.54
UCM quantity/Mm3476.46320.68302.97206.651306.76
Average strip ratio/m3:t5.585.836.557.256.33
Time length/a10.0110.0210.0311.0141.07
NPV/M RMB13716.695920.992235.72712.1522585.55