Research Article

Single-Machine Scheduling with Fixed Periodic Preventive Maintenance to Minimise the Total Weighted Completion Times

Table 12

ANOVA results based on the averages of the proposed heuristic algorithms.

SourceDfSum of squaresMean squareF value

Factor12103.8162103.81623.436<0.001
Error544847.51989.769
Total55