Single-Machine Scheduling with Fixed Periodic Preventive Maintenance to Minimise the Total Weighted Completion Times
Table 7
Worst performance for lower bounds compared to the optimal solutions.
| n | Maximum RPG (%) | LB1 | LB3 | LB4 | LB5 | NewLB |
| 5 | 42.424 | 34.294 | 68.235 | 62.199 | 0.000 | 6 | 42.620 | 34.304 | 66.683 | 64.976 | 22.162 | 7 | 41.723 | 34.467 | 71.655 | 68.750 | 17.949 | 8 | 48.660 | 41.910 | 76.703 | 71.564 | 20.907 | 9 | 46.659 | 39.082 | 75.132 | 74.592 | 30.586 | 10 | 43.398 | 37.131 | 78.237 | 77.441 | 22.613 | 11 | 45.370 | 39.557 | 77.747 | 77.747 | 24.820 | 12 | 40.329 | 32.909 | 78.523 | 78.523 | 20.986 | 13 | 41.050 | 35.127 | 78.993 | 78.993 | 24.603 | 14 | 38.368 | 29.149 | 80.156 | 80.156 | 22.007 | 15 | 42.546 | 37.534 | 80.655 | 80.655 | 26.603 |
|
|