Single-Machine Scheduling with Fixed Periodic Preventive Maintenance to Minimise the Total Weighted Completion Times

Table 9

Average performance for lower bounds compared to the best lower bound.

nLB1LB3LB4LB5NewLB

208.4643.21874.61273.5510.000
258.0043.20877.45076.5950.000
307.7273.40778.79877.8630.000
357.3843.35679.71278.7380.000
407.3603.69381.07780.1010.000
457.0163.61881.75181.1740.000
507.4144.36782.48381.7120.000
607.0494.32083.13082.4460.000
707.0904.71583.55282.9430.000
807.0584.94584.30683.6220.000
907.0405.07884.26783.5500.000
1007.0925.32584.88284.2750.000
2006.9966.03386.23285.6690.000
3007.0936.42686.78286.1250.000
4007.0196.50786.79786.1850.000
5006.9336.52387.10186.5710.000
10007.0886.87987.31586.6660.000