Numerical Simulation Research on the Stability of Urban Underground Interchange Tunnel Group

Table 3

Analysis of sectional diagram simulation results.

The serial numberPositionConcentration value (MPa)The lithology

1Baopeng gap—K19 + 6001.5Plain fill
2Baopeng ramp—K0 + 7002.7Plain fill/moderately weathered granite
3Baopeng gap—K19 + 4802.3∼3Plain fill
4Qiaocheng-Baopeng ramp interchange—K0 + 92023.8Slightly weathered granite
5Qiaocheng-Baopeng tunnel group—K3 + 7608∼10Plain fill/moderately weathered granite /massive weathered granite/slightly weathered granite
6Qiaocheng long-span J4 gradient section -K3 + 5608∼9Plain fill/moderately weathered granite /massive weathered granite/slightly weathered granite
7Baopeng gap—K19 + 0002.3∼2.4Plain fill
8Baopeng gap—K18 + 7202∼3Plain fill
9Qiaocheng gap—K3 + 2404.5∼5.6Slightly weathered granite