Research Article
Numerical Simulation Research on the Stability of Urban Underground Interchange Tunnel Group
Table 3
Analysis of sectional diagram simulation results.
| The serial number | Position | Concentration value (MPa) | The lithology |
| 1 | Baopeng gap—K19 + 600 | 1.5 | Plain fill | 2 | Baopeng ramp—K0 + 700 | 2.7 | Plain fill/moderately weathered granite | 3 | Baopeng gap—K19 + 480 | 2.3∼3 | Plain fill | 4 | Qiaocheng-Baopeng ramp interchange—K0 + 920 | 23.8 | Slightly weathered granite | 5 | Qiaocheng-Baopeng tunnel group—K3 + 760 | 8∼10 | Plain fill/moderately weathered granite /massive weathered granite/slightly weathered granite | 6 | Qiaocheng long-span J4 gradient section -K3 + 560 | 8∼9 | Plain fill/moderately weathered granite /massive weathered granite/slightly weathered granite | 7 | Baopeng gap—K19 + 000 | 2.3∼2.4 | Plain fill | 8 | Baopeng gap—K18 + 720 | 2∼3 | Plain fill | 9 | Qiaocheng gap—K3 + 240 | 4.5∼5.6 | Slightly weathered granite |
|
|