Research Article

Urban Logistics Services Supply Chain Process Modelling Based on the Underground Logistics System via the Hierarchical Colored Petri Net

Table 2

Parameter setting.

ProcessOperating time (min)Operational cost (yuan/min)

Demand management(1–5)0.02
Bookkeeping(1–5)0.01
Information process(1–5)0.04
Pickup(10–30)0.04
Warehousing(5–10)0.08
Circulation processing(5–10)0.06
Transportation(3–7) in each node0.06
Transshipment(1–4)0.08
3PL distribution(5–30)0.10
Conveyor belts(10–30)0.08
Unmanned vehicles(10–30)0.06
Order review(1–4)0.02