Research Article

Optimal Transportation Scheduling of Prefabricated Components Based on Improved Hybrid Differential Firefly Algorithm

Table 3

Distance between the prefabricated component factory and the construction site Daj (km).

Dajj= 1j= 2j= 3j= 4j= 5j= 6j= 7j= 8j= 9j= 10j= 11j= 12

a= 118.021.425.015.03842.531.630.046.054.885.472.8
a= 245.037.518.018.033.512.520.031.045.060.590.071.0
a= 367.046.081.461.896.080.550.040.525.012.520.011.3