Research Article

Thermal Parameters Inversion Method for Concrete Dam Based on Optimal Temperature Measuring Point Selecting

Table 7

Construction parameters.

Start pipe cooling age (d)Water flow rate ()Water temperature ()Pouring temperature ()Pouring time interval (d)
0∼8d>8d

025101210
1014