Coordinated Planning of Power Grids in Information Parks considering the Time-Space Transfer Characteristics of Data Center Loads
| Branch head and end node | Branch length (km) | Line resistance per kilometer (Ω) | Maximum current (kA) |
| 1–2 | 13 | 10.3 | 2 | 2–3 | 15 | 10.3 | 2 | 2–4 | 14 | 10.3 | 2 | 4–5 | 13 | 10.3 | 2 | 4–6 | 8 | 10.3 | 2 | 4–7 | 9 | 10.3 | 2 | 3–8 | 20 | 10.3 | 2 | 8–9 | 17 | 10.3 | 2 | 9–10 | 6 | 10.3 | 2 | 3–10 | 9 | 10.3 | 2 |
|
|