Research Article
Automatic System Design of Assembly Building Components for Sustainable Building Projects Based on BIM Technology
Table 5
Error rate results of evaluation of different system components.
| System | Actual value (yuan/m2) | Predictive value (yuan/m2) | Error value (yuan/m2) | Error rate (%) |
| References [2]system | 1525.2 | 1835.2 | 310 | 16.9 | References [3]system | 1541.3 | 1848.2 | 306.9 | 16.7 | System of paper | 1428.6 | 1521.8 | 93.2 | 6.1 |
|
|