Research Article

The Planning and Construction Path of Innovative and Intelligent Park Cities Based on Big Data Technology

Figure 18

Restoration of waterfront interface. (a) Key nodes along the river walk in the surrounding mountain, including (i) Meijiang Road, Riverside Drive Trail, (ii) Red Army Square, and (iii) the South Xinhe Road Interface. (b) 40% of the mountain is visible at key nodes, such as (i) the entrance to the Red Mountain Avenue and (ii) youth path trail interface node. (c) Control results for Shi River height superposition.
(a)
(b)
(c)