Research Article
A Two-Stage Optimization Model of Capacity Allocation and Regulation Operation for Virtual Power Plant
Table 7
Daily operation cost results of each scenario.
| Cost type/ten thousand yuan | Scenario 1 | Scenario 2 | Summer | Transition season | Winter | Summer | Transition season | Winter |
| Operation and maintenance costs | 0.09 | 0.09 | 0.13 | 0.09 | 0.09 | 0.13 | Cost of fuel | 1.57 | 0.71 | 1.79 | 1.53 | 0.64 | 1.71 | Environmental costs | 0.58 | 0.31 | 1.02 | 0.58 | 0.31 | 1.02 | Cost of interaction | 0.72 | 0.36 | 2.23 | 0.70 | 0.40 | 2.09 | Cost of start and stop | 0.0018 | 0.0042 | 0.0006 | 0.0018 | 0.0042 | 0.0006 | Cost of response | 0 | 0 | 0 | 0.23 | 0.02 | 0.05 | 2.96 | 1.46 | 5.17 | 2.93 | 1.46 | 5.00 | Total cost | 9.59 | 9.39 |
|
|