Research Article
The Supply Chain Triangle: How Synchronisation, Stability, and Productivity of Material Flows Interact
Table 2
Parameter settings and simulation results.
| Set | Synchronisation | Capacities | Stability | | | | | | | High | Medium | Low |
|
|
|
| | | 14.00 | 2.80 | 2.80 | 2.80 | 2.80 | 2.80 | AINV = 0.27 | AINV = 0.52 | AINV = 0.77 | | | 14.00 | 2.90 | 2.65 | 2.90 | 2.65 | 2.90 | AINV = 0.28 | AINV = 0.54 | AINV = 0.79 | | | 14.00 | 3.00 | 2.50 | 3.00 | 2.50 | 3.00 | AINV = 0.28 | AINV = 0.55 | AINV = 0.81 | | | 14.00 | 3.10 | 2.35 | 3.10 | 2.35 | 3.10 | AINV = 0.29 | AINV = 0.57 | AINV = 0.83 | | | 14.00 | 3.20 | 2.20 | 3.20 | 2.20 | 3.20 | AINV = 0.30 | AINV = 0.58 | AINV = 0.85 | | | 14.00 | 3.30 | 2.05 | 3.30 | 2.05 | 3.30 | AINV = 0.30 | AINV = 0.59 | AINV = 0.88 |
|
|