Research Article
A Simulation Model for Machine Efficiency Improvement Using Reliability Centered Maintenance: Case Study of Semiconductor Factory
Table 6
Overall scenarios of RCM model.
| Scenarios | Time to failure | PM schedule | Machine status | Entity processed |
| 1 | Reached (component failed) | Reached | Stop for PM | Blocked before test | 2 | Not reached | Reached | Stop for PM | Blocked before test | 3 | Reached (component failed) | Not reached | Worn-out | Lost unit | 4 | Not reached | Not reached | Normal | Good unit |
|
|